The biggest mall in Iraq- Erbil Family Mall power station 12 MW ( 12 x 1000 kva ) Perkins in 15/12/ 2009 was start in work up to date no problem .
we did this project with our partner Goran group in erbil and Emisam turkey
This Project have 12 generators size 1000 kVA type perkins work in parallel with main also the Project have 6 transformer 2 000 kVA and 7 ATS. All are work full automatically forward and backward synchronization with grid.
This Project have piano panel with SCADA system can control all the plant form control room.