KARDEM HYBRID PROJECT 2021

Kardem Tekstill Factory 

they invest in hybrid green power from solar by implement roof type  solar panel  on the factory , with our soultion with following benifits

  • fixed power  to main
  • Min. Load on genertaor to save fuel  when main off
  • max. pv power from inverter
  • power management , when amin off to prevent voltage rise

 

Royalstar Energy Systems has successfully implemented and commissioned the Hybrid Control Panel project for the solar power plant with an installed capacity of 1.2 MW in the KARDEM Textile Factory in Edirne Keşan.

Grid, Solar System and Generator work together synchronously.

The surplus of energy produced from solar energy during the day is exported to the grid. In case of a possible power outage, the generator is automatically activated and solar energy continues to be produced. The generator is operated with minimum power and solar energy is utilized at the maximum level. In this way, both the generator saves fuel (the cost is downward) and the solar energy production meets the consumption without interruption.

The system works fully automatically.

solar hybrid synchronization panel 

the panel with deif  controlelr  and indestrial PC  make full star/staop of system amd make full power management of ABB Solar inervter to insure the function above

WhatsApp Image 2022-04-20 at 08.58.34

ABB inverter 100 kw 

ABB inverter with build in  combined box for DC strip  and AC  400 v  connected to totalaizing panel fo 12 inverter , with out Mian breaker

the system work with ABB weather station