PETRONAS Garraf Base Camp, Iraq
2010 2nd project refinery power station plant
The project was desinged to synchrnization cat. 14 generators dual fuel engine (diesel and natural gas) we use the land field gas to save fuel .
we used step-up transformer to 6.6 KV with schneider MV gear switch to supply all oil filed with power with full power management and fuel optimization and shair with GAS up to 65 and 35 % diesel this save 60 % of run cost of fuel
- The first phase started in august 2010.
- 2nd phase start in 2011