Qaiwan group sulymanyiah – iraq
qaiwan city project 2014 ( 4200 kw )
The project have 8 genertaors with 500 kw – 650 kw total power 4200 kw , connect with 2 steup – up transformer to 11 kv transition line to multio flat and villa around 1100 flat.
power station was run by our compnay all service and operation for 4.5 year without any intrupted all time make soft transfer with main without interupted of power in two direction
the city so happy with solutionfor till now
Synchronization panel of project
we use DEIF AGC 200 series as deif dealer to make synchronization system for LV and MV side with bus-coupler in low voltage and medium volatge , with full power management and fuel optimization and forward and backward synchronization with main
soft tarnsfer with main , LTO load take over
SCADA panel of project
SCADA in control room can monitor all 8 gnertaor separtly and the all the project with touch screen 15 inch show all LV and MV power produce and consumed with all data and alarm