Qiwan City Sulymaniayh -Iraq

Qaiwan group   sulymanyiah – iraq

qaiwan city project   2014  ( 4200 kw )

The  project have  8 genertaors with  500 kw – 650 kw  total power 4200 kw , connect  with  2  steup – up transformer to 11 kv transition line to multio flat and villa  around 1100  flat.

 

power station was run by our compnay all  service and  operation  for 4.5 year without any   intrupted all time  make soft transfer with main without interupted  of power in two direction

the  city so happy with solutionfor till now

Synchronization panel of project

we use DEIF  AGC 200 series   as deif dealer to make synchronization system for LV and MV  side  with bus-coupler in low voltage and medium volatge  , with full power management and fuel optimization and  forward and backward synchronization with main

soft tarnsfer with main , LTO load take over

 

 

 

SCADA  panel of project 

SCADA in control room can monitor all 8 gnertaor separtly  and the all the project with touch screen 15 inch show all LV and MV power  produce and consumed  with all data and alarm