There biggest mall in Iraq- Erbil Family Mall power station 12 MW ( 12 x 1000 kva ) Perkins in 15/12/ 2009 was start in work up to date no problem .
This Project have 12 generators size 1000 kVA type perkins work in parallel with main also the Project have 6 transformer 2 000 kVA and 7 ATS. All are work full automatically forward and backward synchronization with grid.
This Project have piano panel with SCADA system can control all the plant form control room.