Petronas projects in Garraft -iraq
1- 2009 camp power station: 2000 kW
5 diesel power station Project was done for 15 Jan. 2009 as non-stop power station, work with fully automatic power management which start/stop of generators depend on load and time, also make equal aging automatically. to save fuel and equal aging
The Project was approved by Petronas and awarded us the refinery project with 14 x 2000 kW after perfect work of the camp station.
start camp power station with 4 diesel generator 500 kW Perkins
supply and installation
Also this Project was designed upgrade in 2014 to work in parallel with main by use Deif controller type AGC-3 for forward and back work synchronize with main, can export to main with fixed power Very smooth efficient system.
Gas generator application in Deif head office and export To main for test and weather Friend power station